Our Terms & Conditions PDF Print E-mail

1. Upon a confirmed order, either written or verbal, a deposit is due, this is calculated at 50% of the total cost of order. The building will be ordered and put into production when the deposit is confirmed as cleared funds. We wait until the funds are cleared as your order is for a bespoke building and is therefore designed and built specifically for your order. Once the order has been placed into production you will be held liable for the full building costs.

2. A further installment, calculated at 25% of the total cost of order will be payable 5 working days prior to the notified delivery date.

3. The final installment, calculated at 25% of the total cost of order will be payable upon completion of delivery or installation, if the installation is completed by South East Steel Limited.

4. The Purchaser confirms that they are entitled to erect the building on the site.

5. The Purchaser agrees to accept delivery and erection of the building within 7 days of notification from the Company where the Purchaser will allow South East Steel Limited or it's subcontractor free and undisrupted access to the site and the use of it's facilites (WC, Water, Electric etc...). The purchaser will also provide adequate provisions for the disposal/removal of building waste, approximately an 8 yard skip per 90sqm.

6. The Purchaser acknowledges that it will be their responsibility to obtain all planning and building consents in addition to any local authority requirements.

7. The Purchaser acknowledges that it will be their responsibility to connect the said building to the storm water system or other as approved by their local authority and that it is at their own expense to satisfy any public authority and that the Company has no responsibility to do so.

8. South East Steel Limited will not be liable in any manner whatsoever for any delay in delivery which is beyond their direct control.

9. Any claim relating to any alleged deficiency in quality of goods delivered by South East Steel Limited, must be reported, in writing, within 7 days of delivery. South East Steel will not be held liable in respect of any such alleged deficiency outside of this period.

10. The Purchaser acknowledges that full structural calculations are not included within this specification and order. Full reports from our structural engineers, including load bearings, wind tolerances and professional structural indemnities, are available upon request at cost price, to be advised.

11. In the event of any deficiency in the quality of goods, the liability of South East Steel Limited (if any) shall be limited to the replacement of such defective goods. All other guarantees, warranties, undertakings, or representations, express or implied, and whether arising by statute or otherwise are hereby expressly excluded (except to the extent only that such exclusion is prohibited by statute) and subject to the last mentioned exception, these terms and conditions are the only terms and conditions of the contract between South East Steel Limited and the Purchaser.

 

 

All Images and Plans on this site are installations of South East Steel Limited and are protected by Copyright © 2009