| Stage 2: Laying Slab |
|
|
|
|
Following our Initial Site Survey and the acceptance of formal proposal, we will if required, complete the needed groundwork and install (lay) the concrete base (slab). This will be carried out as specified in our required engineering plans (see images). In the image above you can see the engineering drawing for the base construction to accomodate a 6m x 10m steel building, below shows the plan elevation for the same building (click on images to enlarge) We will complete all needed groundworks a minimum of four weeks prior to the delivery of building. All details of the groundwork will be discussed during the site survey and will be detailed in our proposal. |